black

船舶辅助机械

登录

单项选择题

The process of boiling seawater in order to separate it into freshwater vapor and brine is usually defined as ().

A.dehydration
B.condensation
C.evaporation
D.dissolution

相关考题

单项选择题 In the production of freshwater from seawater through a process of heating and cooling, the cooling phase of production is usually called ().

单项选择题 The sensing line for the low pressure cutout switch to a refrigeration system is located ().

单项选择题 Which of the following statements is true concerning any evaporator?()

All Rights Reserved 版权所有©求知题库网库(csqiuzhi.com)

备案号:湘ICP备14005140号-1

经营许可证号:湘B2-20140064