单项选择题
A.is the SWL of the crane
B.are the SWL of the crane
C.the SWL of the crane is
D.the SWL of the crane are
单项选择题 Official draft measurements should be()by authorized persons,agreed by both parties involved.
单项选择题 Most pedestal crane power is provided by().
单项选择题 If an attempt is made to hoist a load that exceeds the capacity of an electric winch,an overload safety device causes a circuit breaker to cut off the current to the winch motor().