black

船舶辅助机械

登录

单项选择题

The water level in the gauge glass when a boiler is operating is () when the boiler is shut down.

A.lower than
B.higher than
C.below
D.equal to

相关考题

单项选择题 Large pipes or () are fitted between the steam and water drums to ensure good natural circulation of water.

单项选择题 () system is arranged to ensure that water can be drawn from any tank or the sea and discharged to any other tank or the sea as required to trim the vessel.

单项选择题 () connected to the moving tiller will bring the floating lever pivot and the lever into line at right angles to the screw shaft axis.

All Rights Reserved 版权所有©求知题库网库(csqiuzhi.com)

备案号:湘ICP备14005140号-1

经营许可证号:湘B2-20140064