单项选择题
A.to delay
B.to arrange
C.to sustain
D.to maintain
单项选择题 The Shipowner is under a duty to()the vessel to the port of loading even though it is impossible for her to get there by the canceling date.
单项选择题 The Shipowner is not()by the fact that a remote cause of the loss was an excepted peril.
单项选择题 The Shipowner is entitled to()freight if he is ready to deliver at the port of destination the goods which were loaded.