black

CCNA(640-801)

登录

多项选择题

A new frame relay connection is being brought up. Which of the following are frame relay LMI type options that can be configured on this new link?()

A. EIA/TIA
B. Q.932
C. Q.933A
D. IEEE
E. Cisco
F. Annex D

相关考题

单项选择题 In a lab, two routers are connected directly together using serial interfaces in a back-to-back configuration. No external DCE devices are being used. What additional command is needed to bring this link up?()

单项选择题 You have just obtained a modular Cisco router with 2 serial connections and a BRI/U interface. What other physical piece of hardware is required in order to establish an ISDN connection?()

多项选择题 Which of the following can LCP successfully negotiate during the establishment of a PPP connection?()

All Rights Reserved 版权所有©求知题库网库(csqiuzhi.com)

备案号:湘ICP备14005140号-1

经营许可证号:湘B2-20140064