单项选择题
A term applied to the bottom shell plating in a double-bottom ship is().
A.bottom floor B.outer bottom C.shear plating D.tank top
单项选择题 A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().
单项选择题 A cofferdam is().
单项选择题 When a vessel’s LCG is aft of her LCB,the vessel will().