欢迎来到求知题库网 求知题库官网
logo
全部科目 > 软件认证工程师考试 > 思科认证考试 > CCNA系列认证 > CCNA(640-801)

单项选择题

A workgroup switch is configured with all ports assigned to VLAN 2. In addition,all ports are configured as full-duplex FastEthernet. What is the effect of adding switch ports to a new VLAN on this switch?()

    A. The additions will create more collision domains.
    B. IP address utilization will be more efficient.
    C. More bandwidth will be required than was needed previously.
    D. An additional broadcast domain will be created.
    E. The possibility that switching loops will occur will increase dramatically.

点击查看答案

相关考题

微信小程序免费搜题
微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题