欢迎来到求知题库网 考试题库官网
全部科目 > 计算机软件水平考试 > 计算机技术与软件专业技术资格考试(程序员考试) > 中级软件设计师 > 计算机专业英语

单项选择题

案例分析题

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(3)处应选择()

    A.parts
    B.modules
    C.software
    D.awhole

点击查看答案&解析