单项选择题
An alternator switchboard has a synchroscope and synchronizing lamps, if the synchroscope is broken, which of the steps listed is the most essential before an alternator can be paralleled with the bus ()
A.The breaker should be closed when one synchronizing lamp is dark and the other is bright
B.The breaker should be closed when both synchronizing lamps are bright
C.The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus
D.A portable phase sequence indicator must be used to verify the information from the lamps
相关考题
-
单项选择题
A vessel is equipped with two ships service generatorsGenerator #1 is rated at 900kw and generator #2 is rated at 600kw.During parallel operation, with a hotel load of 1000kw, what should be the kw load on generator #2 ().
A.100kw
B.400kw
C.500kw
D.600kw -
单项选择题
The energy consumed by an AC motor, as strictly reactive power, is ()
A.used to do mechanical work
B.used to establish the magnetic field of the motor
C.lost as heat generated by the windings
D.lost in doing work to turn the motor itself -
单项选择题
A diesel driven emergency generator is prevented from being paralleled with the ships service generators by ()
A.an electrical interlock system
B.an automatic paralleling trip switch
C.the synchronizing oscilloscope
D.the reverse current relay