单项选择题
The construction portfolio may be included as part of the ship().
A.general plans
B.operating manual
C.builders documentation
D.CCS file
点击查看答案&解析
相关考题
-
单项选择题
The circular steel structure installed around the propeller of a towboat is the().
A.nozzle
B.shroud
C.strut
D.hood -
单项选择题
The bow thruster generally is ineffective at().
A.over 3 knots headway
B.at any speed astern
C.at any speed ahead
D.over 1 knot sternway -
单项选择题
Structural bulkheads on a ship are usually().
A.continuous
B.watertight
C.transverse
D.non-watertight
