单项选择题
Which action(s) is/are included in crane operations?()
A.Normal boom stowage and shutdown operations
B.Emergency shutdown operation
C.Removing booms from stowage
D.All of the above
点击查看答案&解析
相关考题
-
单项选择题
Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()
A.On the Certificate of Inspection
B.On the Muster List ("Station Bill")
C.In the Operations Manual
D.In either the official or unofficial log -
单项选择题
When will the float-free emergency position indicating radio beacon be activated after abandoning ship?()
A.Immediately after floating free
B.After about one hour when the salt water activates the battery
C.Only when keyed by the radar of another vessel
D.Only when daylight activates the photovoltaic cell -
单项选择题
When should the emergency position-indicating radio beacon be activated after abandoning an OSV?()
A.Immediately
B.After one hour
C.Only when another vessel is in sight
D.Only after sunset
