单项选择题
A shipboard oil pollution emergency plan is required of ().
A.all vessels, regardless of size and commercial application
B.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboard
C.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or above
D.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
相关考题
-
单项选择题
A fire is considered "under control" when ().
A.all hands are at their fire stations
B.all fire-fighting equipment is at the scene
C.the fixed systems are activated
D.the fire is contained and no longer spreading -
单项选择题
The approval period for a shipboard oil pollution emergency plan expires after ().
A.one year
B.two years
C.four years
D.five years -
单项选择题
The Oil Record Book must be maintained onboard the vessel for ().
A.not less than 3 years and be readily available for inspection
B.6 months and then submitted to the nearest Marine Safety Office for review
C.an annual inspection
D.the duration of the ships active employment
