欢迎来到求知题库网 求知题库官网
logo
全部科目 > 软件认证工程师考试 > 思科认证考试 > CCNA系列认证 > CCNA(640-802)

多项选择题

A Catalyst 2950 needs to be reconfigured. What steps will ensure that the old configuration is erased?()

    A. Erase flash.
    B. Restart the switch.
    C. Delete the VLAN database.
    D. Erase the running configuration.
    E. Erase the startup configuration.
    F. Modify the configuration register.

点击查看答案

相关考题

微信小程序免费搜题
微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题