单项选择题
Which part of a conventional cargo gear rig provides for vertical control and positioning of a boom().
A.Cargo whip
B.Gooseneck fitting
C.Spider band
D.Topping lift
点击查看答案&解析
相关考题
-
单项选择题
Which operation may cause the pressure in an inert tank to fall below the prescribed limits().
A.Loading
B.Discharging
C.Crude oil washing
D.Steaming tanks -
单项选择题
Which of the following statements is FALSE concerning cranes being installed on the centerline of vessels().
A.A centerline crane can never be operated in tandem
B.One crane is able to work one end of two adjacent hatches
C.These cranes are more economical and weigh less than outboard-mounted cranes
D.One crane is able to work both sides of the ship -
单项选择题
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().
A.The cranes may be operated independently
B.The cranes may be interconnected for twin operation
C.When twinned,the crane rotation on the foundation assembly is unlimited
D.All of the above