单项选择题
Last december you erected a bridge link between two buildings on your campus. it is now april and the foliage in the trees is full, and the bridge link will no longer maintain connectivity.
Which action will most likely solve the problem?()
A.change the channel selection.
B.install higher gain antennas.
C.raise the antennas.
D.increase transmitter power.
相关考题
-
单项选择题
An 802.1x client cannot authenticate to an autonomous access point configured for multiple vlans. the native vlan does not have an ssid configured. Which one of the following links being down would prevent the clients from authenticating?()
A.between the radius and the access point
B.between the client’s vlan and the wlse
C.between the native vlan and the wlse
D.between the client’s vlan and the radius -
单项选择题
Whichofthefollowingpowersettingsrepresents50percentpowerinalightweightaccesspoint?()
A.1
B.4
C.2
D.5
E.3 -
多项选择题
In a deployment using the lightweight access points, clients set up to authenticate with eap-peap or eap-cisco wireless (leap) cannot authenticatE. upon inspection of the failed attempts report you see the following error: "unknown network access server nas." What two problems can cause this type of failure?()
A.misconfigured ip address of the aaa server on the wireless controller
B.misconfigured ip address of the wireless lan controller on the aaa server
C.misconfigured eap type on the wireless lan controller
D.misconfigured shared secret on the wireless lan controller
E.misconfigured eap type on the aaa server
